Stages nobody agrees on
One estimator calls a job “quoted” after the visit, another after the proposal goes out. The counts mean nothing because the words mean different things.
How many proposals are out right now, and what are they worth? If answering means scrolling through texts, you don’t have a pipeline yet. We set the stages, the rules for moving between them, and the view you check each week.
Part of the engine: System · Tracking that improves it monthly
One estimator calls a job “quoted” after the visit, another after the proposal goes out. The counts mean nothing because the words mean different things.
Jobs vanish from the board without a note. You can’t tell whether you’re losing on price, on speed, or to the same competitor every time.
You know it’s been a slow month, but not whether the trouble is too few leads, too few visits, or too few signatures.
Each stage has a short definition of what must be true for a job to move into it, so everyone counts the same way.
A short pick-list of loss reasons, filled in when a job is marked lost, so patterns show up after a few months of real data.
Jobs and dollar value at each stage, how long each has been sitting, and which ones need a call this week.
The share of jobs that move from each stage to the next, which points at the part of your sales process that needs work.
We sit down with you and whoever runs estimates and name the stages the way your team already talks about jobs.
What moves a job forward, what marks it lost, and who updates it, on one sheet your team can follow.
Stages, loss reasons, and the weekly view built in Jobber, ServiceTitan, Housecall Pro, or GoHighLevel.
We go through the numbers together and point at the stage where the most jobs are stalling or dying.
Attention × Offer × Sales × System. A weak part drags the others down, so we build and run all four.
Every estimate sitting on a kitchen table is money you might sign. Weight it honestly and see what your pipeline is really carrying.
Expected revenue from open estimates: $187,500
25 open estimates at $30,000, 25% expected to sign, about 21 days to decide.
See what we’d build for these numbersStarts with example numbers. Change them to yours. Arithmetic only, not a promise of results.
CRM and automation is the machinery: the software, the messages, the tasks. The pipeline is what you read from it: the stages, their definitions, and the numbers that tell you where sales are breaking. A tidy board with no definitions teaches you nothing.
Fewer than most software defaults. New lead, estimate booked, estimate held, proposal sent, signed, and lost cover most contractors. Add a stage only when your team does something different at that point, like a design meeting or a financing approval.
Roughly. Example numbers, not a benchmark: 12 proposals out at an average of $18,000, with a past close rate of 25%, points to about $54,000 likely to sign. It’s a planning figure, and it only gets trustworthy once your stages and close rate are measured honestly.
Because the fix depends on the reason. Losing on price calls for better qualification or a range shown up front. Losing on timing calls for follow-up. Losing to slow proposals is a process problem. Without reasons, you end up fixing the wrong thing.
Seven questions. Two minutes. See the one part of your engine holding your projects back.
Show me where I’m losing jobsFree 2-minute assessment · No pitch, no obligationAvg response time 2.5 minutes