TEMPLATES · AFTER THE ESTIMATE

Contractor sales follow-up templates for after the estimate is sent.

The proposal is out. These are the emails and texts that keep it moving for the next 30 days without sounding like a sales push.

  • Email templates
  • 9 ready to copy
  • Free, no signup

By the BlueSmith team · Updated

HOW TO USE IT

Three steps. Then make it yours.

  1. 01

    Copy

    Save each block as an email or text template in your CRM, tied to the estimate stage of your pipeline.

  2. 02

    Make it sound like you

    Fill in the brackets from the actual visit. The recap and the options email should be personal, not generic.

  3. 03

    Put it to work

    End the sequence once they sign, turn you down, or ask you to stop. Unsigned proposals go on a slow check-in list.

Before you send anything
  • Swap every [bracket] for your real details.
  • Read it out loud. If you wouldn’t say it, change it.

Written by BlueSmith as examples. Not client messages or results.

COPY AND USE

Contractor sales follow-up template, ready to copy.

01

Same day · proposal recap email

Send within a few hours of the visit, signed by whoever did the walkthrough.

Subject: Your [project] proposal

Hi [First name],

Thanks for walking me through the [project] today. [One detail from the visit.]

Your proposal is attached. In short:
- Included: [scope in plain words]
- Not included: [exclusions]
- Price: [total], paid [schedule]
- Start window: [realistic range]

If anything in there doesn’t match what we talked about, tell me and I’ll fix it.

[Your name]
[Company] · [direct phone]
02

Day 1 · text that the proposal landed

Only text homeowners who opted in. If this is your first text to them, add “Reply STOP to opt out.”

Hi [First name], [Your name] with [Company]. Just making sure the [project] proposal reached your inbox. It came from [email address], in case it’s hiding in spam.
03

Day 3 · questions after sleeping on it

Subject: Questions on the [project]?

Hi [First name],

Most people come up with a question or two once they’ve had a night with a proposal. For a [project type], the usual ones are [question 1] and [question 2].

Short answers: [answer 1]. [answer 2].

If yours is something else, reply here or call me at [phone].

[Your name]
04

Day 6 · if they’re comparing bids

Help them compare fairly. Don’t knock the other contractor.

Subject: If you’re comparing bids on the [project]

Hi [First name],

Getting more than one quote is smart. When you line them up, check that each one covers [item 1], [item 2], and [item 3], since those details change the price the most on a [project type].

Happy to go through ours line by line next to anything else you’re looking at.

[Your name]
05

Day 9 · text check-in on timing

Hi [First name], no pressure on the [project]. Is the timing still [month or season] like you mentioned, or has that moved?
06

Day 14 · ask what’s in the way

Subject: Where things stand on the [project]

Hi [First name],

I don’t want to keep emailing if the project’s off the table, so I’ll just ask: is something holding it up? Budget, timing, a different bid, or a busy month are all normal answers.

A one-line reply tells me whether to check back later or close the file.

[Your name]
07

When they say yes

Great news, [First name]. Thanks for choosing [Company]. Next step is [contract or deposit step]. I’ll send that over by [time], and [name] will reach out to schedule the start.
08

When they pick another contractor

Reply with grace. Some of these come back if the other job falls through.

Thanks for letting me know, [First name]. I appreciate the straight answer. If anything changes or you need a hand down the road, you have my number. Hope the project goes great.
09

Day 30 · close the loop

Subject: Keeping your [project] proposal on file

Hi [First name],

I’ll stop checking in on the [project] for now. Your proposal stays on file, and if you come back to it, I’ll update the pricing and timing so you’re working from current numbers.

Thanks again for having us out.

[Your name]
[Company] · [direct phone]
RUN YOUR NUMBERS

Estimate-to-sale funnel: follow your leads all the way to signed jobs.

Leads drop out at every step: some never book, some don’t show, some don’t sign. See where yours go and what reaches the bank.

35%
85%
30%

Revenue per month: $89,250

Revenue per month$89,250
Estimates you actually run
12
Signed jobs per month
3.6

40 leads → 35% booked → 85% held → 30% closed at $25,000.

See what we’d build for these numbers

Starts with example numbers. Change them to yours. Arithmetic only, not a promise of results.

Open the full estimate-to-sale funnel calculator

STRAIGHT ANSWERS

Questions we hear.

Who should send these, the office or the estimator?

The messages should come from whoever did the walkthrough, even if the office schedules them. Homeowners trust the name they met, and replies go to the person who can answer scope questions.

Is it okay to mention other bids?

Yes, if you’re helping them compare rather than attack the competition. Pointing out what a complete bid should include builds trust; trashing another contractor usually costs it.

Should I offer a discount to close the deal?

Not as a reflex. If price is the issue, offer a real scope change, a different material, or phasing. A discount that appears after silence teaches homeowners to wait you out.

What happens to proposals after day 30?

They go on a slow check-in list. Budgets and timing shift, and a homeowner who has walked the job with you and seen your number is worth a short note every couple of months.

Want this running without you typing it?

Seven questions. Two minutes. See the one part of your engine holding your projects back.

Show me where I’m losing jobsFree 2-minute assessment · No pitch, no obligation

Avg response time 2.5 minutes